Network Access
Network Access updates
Network Access Horizon Newsletter Issue 4
Communication with stakeholders is important to Network Access.  We have decided to provide a news...
More»
QR submission to the Productivity Commission's Review of the Economic Costs of Freight Infrastructure and Efficient Approaches to Transport Pricing
The Rev...
More»
Coal Reference Tariffs
Tariffs for QR’s coal systems for 1 October – 31 December 2007. Contains the relevant tariffs for ...
More»
QR Updates Line Diagrams in accordance with Access undertaking
QR has updated both North and South Line Diagrams in accordance with section 2.2(b). More»
Information packs


These packs provide potential Access Seekers with background infrastructure and operational information for the specified system. The detail provided in this pack relates to infrastructure and operational information necessary to develop an Access Application.

Operational parameters outlined in this pack may be varied by mutual agreement with Network Access.  It is recommended that Access Seekers initially view network system information - 13 systems, to determine which system is applicable to their Access Application (predominant traffic is indicated: P-Passenger, C-Coal and F-Freight).

Please note that the information contained in each pack is subject to change.  Potential Access Seekers wishing to rely upon this information should contact Network Access prior to completing their Access Application.


System Information Packs
pdf
[1.02 Mb]
Network System Information - 13 systems
This is an overview of the 13 systems and details about the number of tracks and stops.
Railway Infrastructure Map
pdf
[103.33 kb]
Information Request Order Form
Request a hard copy of a system information pack for a AU$550 including GST. Rollingstock Interface Standards CD is available for AU$1,100 including GST.
Request Form
pdf
[1.99 Mb]
Newlands System - C
System Information Pack
pdf
[5.36 Mb]
Blackwater System - C
System Information Pack
pdf
[3.08 Mb]
Tablelands System – P,F
System Information Pack
pdf
[3.12 Mb]
Goonyella System – C
System Information Pack
pdf
[2.80 Mb]
Moura System - C
System Information Pack
pdf
[3.70 Mb]
Standard Gauge System – F
System Information Pack
pdf
[4.69 Mb]
Mt Isa System – F
System Information Pack
pdf
[4.47 Mb]
Central West System - F
System Information Pack
pdf
[6.05 Mb]
Western System – F
System Information Pack
pdf
[3.63 Mb]
South Western System – F
System Information Pack
pdf
[4.99 Mb]
Maryborough Area System - F
System Information Pack
pdf
[8.96 Mb]
North Coast Line System South - P, F
Nambour to Gladstone and Rocklands to Rockhampton.
System Information Pack
pdf
[11.48 Mb]
North Coast Line System North - P,F
Rockhampton to Cairns.
System Information Pack
pdf
[6.68 Mb]
Brisbane Metropolitan System - P,F
System Information Pack


graphic Need some assistance? Contact Us
Network Access
07 3235 3144


 Quick Find...

Conceptual Operating Plan
What is it?
A form which requires information on the proposed operations on the QR network.
The process
You will receive a response within seven days of receiving your Conceptual Operating Plan.
What you need to do
Detail your proposed operations so Network Access can determine their viability.
More | Download

Useful Documents
Glossary of terms
View | Download
Network System Information
View | Download
Coal Reference Tariffs
View | Download
  line
Email Email a friend Print Print this page Back to Top Back to top

 
07 3235 3144
spacer