Network Access
Network Access updates
Moura Link - Aldoga Rail EIS
The Environment Impact Statement (EIS) for the Moura Link - Aldoga Rail EIS has been released. 
Coal Reference Tariffs
Tariffs for QR’s coal systems for 1 July – 30 September 2008. Contains the relevant tariffs for Bl...
More»
Network Access Horizon Newsletter Issue 4
Communication with stakeholders is important to Network Access.  We have decided to provide a news...
More»
QR Updates Line Diagrams in accordance with Access undertaking
QR has updated both North and South Line Diagrams in accordance with section 2.2(b). More»
Common questions


When do I need to obtain permission from QR to travel?

You must have the necessary authority when the load exceeds legislative requirements set down in the Transport Infrastructure (Rail) Regulation 2006.  A summary of these requirements can be found at overdimensional loads overview. For more details, refer to the Transport Infrastructure (Rail) Regulation 2006 available on the Office of the Queensland Parliamentary Counsel web site.

Why do I need a permit?

A permit is an authority to travel, under specific conditions, and is issued to manage adverse affects on QR’s Network.  A permit is a legislative requirement, and it is important to ensure the safety of all people involved in the transportation of over dimensional road loads, QR staff and the general public. 

A permit also ensures that all QR infrastructure is protected from potential damage and that the police are informed of QR requirements. Police must check the permit before travel.

Why do I need a confirmation?

A confirmation is authority to travel without added restrictions from QR.  It is a requirement of the Queensland Police that Over-dimensional road loads are checked for dimension and route by QR before travelling. 

The police require all over-dimensional road loads to have a confirmation from QR even when it does not travel over QR infrastructure.  

There is no charge for a confirmation.

What is the application fee?

The fee varies, depending on the over dimensional road load and complexity of the application. A list of the relevant fees can be found at Overdimensional loads charges

Is there an additional fee if I change the details on my application?

You may have to pay an additional permit fee to cover the extra work required to process the change requested. An additional permit fee may apply if the following changes are made outside of the relevant time frames specified by QR:

  • a change of route;
  • a change of date; or 
  • change of dimensions.  

A list of the relevant fees can be found at Over-dimensional loads charges

When I have a change of details, do I have to send a whole new application?

No. You simply put a line through the original information that you want to change and write the new information next to or directly above the obsolete information; then re-fax the application. 

How much notice does QR require?

The applicable Application Form sets out how much notification must be received by QR before the transportation of an over-dimensional road load on QR infrastructure.  Depending on the type of load that is being transported, different requirements need to be met.

What happens if I don’t obtain an authority?

You may incur penalty units under the Transport Infrastructure (Rail) Regulation 2006 and be liable for any damages to QR infrastructure.

Please note that a permit or confirmation does not prevent liability including damage to QR property and personal injury to any person.  

Police escorts should not allow the move to proceed without a written QR permit or confirmation to cross the rail infrastructure.

Why must I list overbridge and open level crossings in the application?

This allows routes to be checked in order to ensure the safety of both QR infrastructure and all concerned parties.

Why must I list the time that the over dimensional road load will cross an open level crossing?

QR requires an estimated time so we can:

  • inform QR Train Control to ensure the safe passage of any trains 
  • allocate staff at the correct times (if required) 
  • avoid incidents involving trains and rail mounted vehicles that can use the track at anytime.  

How do I apply for permission?

Apply to move an over-dimensional road load through Network Access’ Over Dimensional Road Loads Division.  For details regarding applications, view the  Application Process

What should I do if I haven't received a permit or confirmation from QR?

If you have not received a permit or confirmation by 10 am four working days prior to the move, it is important to call QR on 07 3235 1719 as soon as possible. If you do not contact QR your move on the required date may be in jeopardy.

line

Related Links:
» Overview
» Application


graphic Need some assistance? Contact Us
Network Access
07 3235 3144


 Quick Find...

Conceptual Operating Plan
What is it?
A form which requires information on the proposed operations on the QR network.
The process
You will receive a response within seven days of receiving your Conceptual Operating Plan.
What you need to do
Detail your proposed operations so Network Access can determine their viability.
More | Download

Useful Documents
Glossary of terms
View | Download